Shape Shape

Kivi Automation

Electric

We design and project your facilities in a total structure from High Voltage to Low Voltage, from PCC (Power Control Center) to MCC (Motor Control Center).

• We audit and report electrical rooms and electrical panels in line with current standards, regulations and OHS directives.

• We analyze the current status of your installation with grounding and harmonic measurements. We share the solution of identified problems.

• We inspect the status of the electrical installation with the electrical internal installation control, and share the identified risks and solutions with you.

• For the problems you faced with the compensation system, as a result of analysis and measurements, we identify the problems and offer solutions to eliminate them.

Electric